Engineering review, quality inspection, export documentation and logistics coordination — the services that surround every order.
Service center
Services
What happens around the machines: engineering, inspection, documents and freight.
Services around the order
Manufacturing is the core — these are the services that make an overseas order painless.
OEM / ODM manufacturing
Production to your drawings or joint development from a concept sketch.
Quality inspection
Incoming material checks, in-process inspection and final reports per batch.
Export documentation
Commercial invoice, packing list, certificates of origin and customs papers.
Logistics coordination
Sea, rail and air freight booked to your destination port or door.
Engineering support
Tolerance review, material substitution advice and cost-down proposals.
After-sales response
Claims answered within 48 hours with corrective action reports.
How an order runs
STEP 01
Send inquiry
Drawings, specifications, target quantity and destination port.
STEP 02
Engineering review
Feasibility, tolerances and material check — quotation within 24 hours.
STEP 03
Production & QC
In-process inspection, material certificates and dimensional reports.
STEP 04
Packing & shipment
Export packing, documentation and freight coordination to your port.
Frequently asked questions
What is your minimum order quantity?
MOQ depends on the product and material. Trial orders and samples are supported for most standard items — state your target quantity in the inquiry and we quote accordingly.
Can you produce to our drawings and standards?
Yes — production to customer drawings is our main mode. We work to ASTM, EN, DIN, JIS and GB standards, and our engineers flag any tolerance or material concern before quotation.
How do you control quality?
Incoming material verification, in-process inspection at each line, and final inspection before packing. Material certificates and dimensional reports ship with every batch; third-party inspection (SGS, BV) is welcome.
What are your lead times and shipping terms?
Typical production lead time is 15–35 days depending on the order. We quote EXW, FOB or CIF and coordinate sea, rail or air freight to your port.
How fast do you answer an inquiry?
Quotations go out within 24 hours on working days. Complex fabrication drawings may take 48 hours with an engineering review included.
Send your drawings.
Get a quotation within 24 hours.
Attach specifications, target quantities and destination port — our engineers reply with pricing and lead time.